Two or more storey in Saint-Lazare

899,900 $
Description
Stunning property located in the highly sought-after Boisé Champêtre area of St-Lazare! Offering 4 bedrooms and 2 bathrooms, including an ensuite to the primary bedroom with a large walk-in closet, as well as a powder room with laundry area on the main floor. Brand-new kitchen (2026), fully renovated basement (2026) and a four season sunroom. Double garage with epoxy flooring and a lot of storage. Spacious, private, wooded lot with no rear neighbors, featuring a new heated pool. Metal roof offering peace of mind with its 50 year warranty. Prime location close to the village, services, and highway. A must-see!
Highlights
8.3x13.4 P
Ceramic tiles
12.4x16.4 P
Wood
10.0x17.8 P
Ceramic tiles
10.0x15.2 P
Ceramic tiles
11.9x13.4 P
Wood
12.9x13.4 P
Flexible floor coverings
8.1x8.7 P
Ceramic tiles
4.11x8.1 P
Ceramic tiles
7.9x8.6 P
Wood
12.4x14.0 P
Wood
5.1x7.1 P
Wood
4.11x10.5 P
Ceramic tiles
9.4x13.4 P
Wood
10.2x11.9 P
Wood
4.11x7.5 P
Ceramic tiles
11.10x23.7 P
Floating floor
13.1x19.2 P
Floating floor
4.6x8.10 P
Floating floor
4.10x7.5 P
Concrete
9.1x11.1 P
Concrete
Renovations and Improvements:
-
Installation of a new pool and filtration system in 2025 (water heater is older).
-
Landscaping completed around the pool and patio. Addition of a new patio with built-in benches.
-
Kitchen renovated in February 2026 (cabinets, range hood, plumbing fixtures, wood countertop on the island, light fixtures, backsplash) and relocation of the door leading to the entrance.
-
Painting work completed in 2026 (kitchen, breakfast nook, entryway with wainscoting, bathrooms, and powder room).
-
Replacement of light fixtures in the bathrooms, primary bedroom, breakfast nook, and dining room in 2025.
-
Replacement of all three toilets in 2024.
-
Basement renovation in April 2026 (flooring, reconfiguration of layout, painting, woodwork, addition of recessed lighting, addition of a walk-in closet).
-
Installation of a Dragon type heating system in the garage in 2024.
-
Replacement of one kitchen window and addition of a new window. Replacement of two basement windows in August 2023.
-
Installation of custom blinds (bathrooms, powder room, dining room, and both entrance doors).
-
Replacement of the heating system thermostat in October
-
Replacement of the septic system pump in July 2024.
-
Metal roof replaced in 2013 with a transferable 50 year warranty.
-
Two heating elements in the water heater were replaced in
- Fireplace cleaned and repaired in 2026.
Life Style
Suggested properties
Open house
Saturday May 09 : 14h to 16h
The more it is seen, the faster it is sold!
Activi-T
Views on the internet: 0
Visibili-T
Seen by over a million potential buyers every month, your property is displayed FREE of charge on over 100 websites across the country and around the world.
Suggested properties











































